Specifications include, but are not limited to: Construct new space to house electrical and control equipment Installation of a new ceiling to prevent gases from migrating Sealing of present and former unused roof and floor slabs Conversion of wetwell level instrumentation to an ‘intrinsically safe” design Construction of a new exterior and pad Installation of a precast vault New 3 phase 480V electrical service with a 400A service Replacement of sewage pumps with “chopper” type pumps Removal and installation of new suction piping Replacement of pump and header isolation valves and pump discharge valves Extend aluminum platform from door landing and install a ship’s ladder Installation of a microprocessor-based Pump Station Control Panel Installation of a new service sink and a water service backflow preventer Capability and ability to install and operate full lift station bypass, if necessary.