Specifications include, but are not limited to: 1. Provide temporary facilities and protection including protective barriers, dust control, water runoff control and traffic control. provide orange safety fencing prior to initiating demolition activities. Completely remove fencing after completion of demolition activities. ;Locate utilities and confirm utility shutoffs or deactivations, followed by disconnection, capping and removal of utility lines serving the property to be demolished as indicated. ; 3. Protect storm sewer system from impact by the work performed by the Contractor (e.g. cover catch basins temporarily to prevent fill of system with debris). During times of heavy precipitation, the Contractor may remove catch basin protective covers ; Demolish all above ground pipes and conduits that remain above the slab, as needed to demolish the building ; Remove the building in its entirety, excluding slab which may be crushed and left in place. Foundation walls to be removed to a depth of 24” below the surface. Any onsite demolition operation must be regularly sprayed with water.