Specifications include, but are not limited to: The scope of work for the installation of the precast concrete vault and electronically actuated valves include, but is not limited to, the following. a. Installing a new concrete utility vault at location shown in drawings. b. Installing a new electronically actuated knife gate or pinch valve on the existing 8 inch PVC sewer line. c. Valve should be any of the following or be comparable to the following: i. AUMA SAREX 10.2/ACEXC01.2 ii. AUMA SA 16.2/AC01.2 iii. Red Valve Series 5200E on/off Electric Actuator d. Installation and connection of conduit and wire from the valve to the existing fire alarm panel located in the main entrance of Building 320. e. Restoration of the site after construction is complete.