Specifications include, but are not limited to: The Contract will consist of submitting an Attachment 3, surveying and removal, disposal of existing and installation of the total square feet of cement ADA of concrete sidewalk ramps with detectable warning strips and abutting sidewalks at various locations throughout the State. Ramps and sidewalks will be constructed to the dimensions and details shown on the Client Agency approved Concrete Sidewalk Ramp replacement Attachment 3, submitted by the Contractor for each assigned curb ramp. Each time the Contractor completes Attachment 3, Attachment 2 is to be referenced. Prior to pouring concrete for ramp or sidewalk, all work required to construct the ramp or sidewalk will be completed and will include, but not be limited to: construction surveying, saw cutting pavement, the resetting of all public and private water gates, gas gates, catch basins tops, manhole tops, and hand holes that may conflict with ramp grades. The quantity range utilized for pricing on the “Concrete Sidewalk/Ramp” item in Exhibit B, Price Schedule, will reflect the total quantity of square feet measured in each designated combined groupings assigned by the maintenance districts. Noncontiguous road segments of ADA concrete ramp and sidewalk groupings are permitted under Contract and may be compiled on a single purchase order, provided each group is not outside the limits of a one (1) mile radius. Contiguous road segments of ADA concrete ramp and sidewalk groupings located within the limits of more than one (1) mile may be awarded as a single purchase order.