Specifications include, but are not limited to: Land record research will be required to determine deed lines. B. A boundary survey will be performed to determine the location of boundary lines based on existing monuments found, lines of occupation (i.e. stone walls and fences), existing maps and deed descriptions recorded in the Windham Land Records. Existing improvements will also be field located. The survey shall conform to A-2 standards for horizontal accuracy, as defined in Section 20-300b of the General Statutes of Connecticut, prepared by a land surveyor licensed to practice in the State of Connecticut. The survey information shall include but not be limited to boundary research and determination both record and field work, field survey work such as existing and proposed conditions, topography and utilities, map boundary analysis and Street line determinations. Topographic survey shall conform to T-2 standards with contours displayed at a 1’ vertical interval.