Specifications include, but are not limited to: 1 EARTH EXCAVATION CY 20* $ $ 2 PROCESSED AGGREGATE BASE CY 20* $ $ 3 REMOVE BITUMINOUS CONCRETE PAVEMENT (0” TO 6”) SY 1,290 $ $ 4 FORMATION OF SUBGRADE SY 1,260 $ $ 5 HMA S0.375 TON 95 $ $ 6 HMA S1.0 TON 215 $ $ 7 PERMANENT PAVEMENT REPAIR SY 10 $ $ 8 ASPHALT ADJUSTMENT COST EST N/A $ 1,000.00 $ 1,000.00 9 5” CONCRETE SIDEWALK SF 60 $ $ 10 5” CONCRETE SIDEWALK AND CURB MONOLITHIC SF 480 $ $ 11 6” CONCRETE DRIVEWAY APRON SF 300 $ $ 12 RESET GRANITE STONE CURB LF 12 $ $ 13 EXTRUDED CONCRETE CURB LF 360 $ $ 14 RESET TYPE “C-L” CATCH BASIN TOP (NEW TOP) EA 1 $ $ 15 RESET MANOLE (STORM) EA 2 $ $ 16 2” PVC CONDUIT LF 200 $ $ 17 LIGHT POLE FOUNDATION EA 3 $ $ 18 CONCRETE HANDHOLE EA 2 $ $ 19 RESTORATION OF LAWN AREAS SY 150 $ $ 20 4” WHITE PAINTED PAVEMENT MARKINGS LF 580 $ $ 21 PAINTED PAVEMENT MARKINGS, SYMBOLS AND LEGEND SF 200 $ $ 22 SIGN FACE SHEET ALUMINUM (TYPE III REFLECTIVE SHEETING) SF 3 $ $ 23 SILT SACK EA 3