Specifications include, but are not limited to: 0010 0201001 CLEARING AND GRUBBING LUMP SUM _______________.____ 1.000 _______________.____ 0020 0202000 EARTH EXCAVATION c.y. 5,375.000 _______________.____ _______________.____ 0030 0202100 ROCK EXCAVATION c.y. 12.000 _______________.____ _______________.____ 0040 0202200 CHANNEL EXCAVATION-EARTH c.y. 114.000 _______________.____ _______________.____ 0050 0202250 CHANNEL EXCAVATION-ROCK c.y. 11.000 _______________.____ _______________.____ 0060 0202501 CUT CONCRETE PAVEMENT l.f. 749.000 _______________.____ _______________.____ 0070 0202502 REMOVAL OF CONCRETE PAVEMENT s.y. 3,092.000 _______________.____ _______________.____ 0080 0202529 CUT BITUMINOUS CONCRETE PAVEMENT l.f. 2,583.000 _______________.____ _______________.____ 0090 0204151 HANDLING WATER ** See Special Provisions ** LUMP SUM _______________.____ 1.000 _______________.____ 0100 0207000 BORROW c.y. 3,639.000 _______________.____ _______________.____ 0110 0209001 FORMATION OF SUBGRADE s.y. 11,891.000 _______________.____ 1.00 0120 0210820 WATER POLLUTION CONTROL (ESTIMATED COST-PLUS) est. 10,000.000 10,000.00 _______________.____ 0130 0211000 ANTI-TRACKING PAD s.y. 684.000 _______________.____