As part of the recently completed construction works at the NLSP, shore-to-ship power plug-in capabilities were provided at both berths (Northeast and East). The plug-in at the Northeast berth can support vessel hotel loads (lighting, climate control, ward rooms, kitchen) only, whereas the plug-ins at the East berth can support both hotel and vessel operations (excluding installation main crane) loadings. The Project includes furnishing and installing an additional power vault at the East Berth with a 6.6 kV shore power connecting system and procuring and installing a Mobile Cable Management System (CMS) that can connect to the power vault, or to one of the two existing vaults, and supply cabling to the docked vessels. The additional power vault to be installed at the East Berth will allow the mobile unit to serve a wider variety of vessel types and sizes. The Authority seeks proposals (“Proposals”) from manufacturing firms (“Proposer”) to provide the following, which are further outlined in Exhibit A of this RFP. • A second (northern) high-voltage shore power outlet (SPO) at the installation berth that can support both hotel and vessel operational loadings. • A mobile cable management system (CMS) that connects the installed shoreside electrical infrastructure to the shipboard systems.