Specifications include, but are not limited to: 1. 1 Small containment preparation containment (less than 160 square/260 linear feet of asbestos-containing material) Pricing for containments with larger amounts of materials are to be INCLUDED in the unit prices themselves listed below. There is no separate unit price for containments with larger amounts $ containment 2. Mudded pipe fitting/roof drain insulation, removal and disposal as ACM $ fitting/joint 3. Glove bag, removal and disposal as ACM $ bag 4. Pipe and pipe fitting insulation, removal and disposal as ACM $ lf 5. Sheetrock and taping compound, removal and disposal as ACM $ sf 6. Textured ceiling paint and substrate, removal and disposal as ACM $ sf 7. Ceiling plaster (all layers), removal and disposal as ACM $ sf 8. 9 Air duct vibration isolation cloth, removal and disposal as ACM $ cloth 9. Transite cement board, removal and disposal as ACM $ sf 10. 1Roof flashing (all layers), removal and disposal as ACM $ sf 11. 1Roofing core/field (all layers, including materials on deck), removal and disposal as ACM $ sf 12. Roof caulking compounds (all layers), removal and disposal as ACM and PCBs $ lf 13. Removal/Abatement work, transportation and disposal of lead hazardous waste (TCLP >5mg/L – includes substrates and contaminated materials) in 40-yard dumpster, removal, transportation and disposal as Lead Hazardous Waste $ dumpster 14. Metal roof deck, thickness to match existing roof deck to be removed (including deteriorated roof deck removal, credit and add) $ sf 15. Add pressure treated wood blocking, as specified, cut to fit around roof structure and systems installed $ bf 16. Deduct pressure treated wood blocking, as specified, cut to fit around roof structure and system installed $ bf