Specifications include, but are not limited to: Project description The Town intends to: patch and repaint interior corridors walls with approximately 7000 square feet of surface area including 43 doors with trim and patch and paint one accent wall within the main auditorium. The Town would also need five alternates; prepping and painting the glazed brick in the front entrance, prepping and painting two exit stair enclosures, prepping and painting the new wall board in the second floor women’s bathroom, prepping and painting the wainscoting within the First Selectmen’s office and a square foot price for prepping and painting additional office areas, including furniture moving. Scope of Work Preparation: Observe manufacturer’s recommendations in regard to preparation of surfaces to receive paint and application of paint itself. Procedures shall include, but not necessarily be limited to, the following: a. Cleaning - Clean down and remove oil, grease and loose foreign matter, including, mold mildew, dirt and corrosion products, in a manner which causes neither undue damage to the substrate nor damage to, or contamination of, the surroundings or the paint system to be applied; b. Glossy Surfaces - Adequately scuff and/or proper primers as appropriate to provide satisfactory adhesion for subsequent paint coats; c. Filling - Fill cracks and holes with fillers, sealers or grouting cements as appropriate for the finishing system and substrate, and sand smooth, to ensure all coats finish smooth; d. Drying - Unless otherwise specified, ensure that surfaces are cured and dry before applying additional coats of paint; e. Light sanding between coats. 2. Paint Material - Use only Sherwin-Williams for the walls, doors and trim. 3. Primers, sealers, undercoats - Ensure that primers, sealers and undercoats are suitable for the substrate and compatible with the finish coat and each other where required. Paint Application a. Apply at least two coats of selected finish color paint or with the number of coats specified in accordance with the manufacturer's recommendations. Allow each coat to harden for the drying time (or time between coats) recommended by the manufacturer