Specifications include, but are not limited to: Inspect existing conditions and provide a corrective plan to the DOC representative for failing epoxy wall and floor coverings in inmate shower areas. Contractor shall remove any loose materials and provide the preparation of the substrate, any priming, patching and block filler materials required, furnish and apply all components of epoxy based wall and floor coating system. Match existing system epoxy coverings or equivalent to specifications. Color, chips and urethane topcoats to match existing. The contractor shall provide all necessary material and labor to complete the renovation to the shower units. Where required demolish, removal, and repairs of any defective walls and floors materials. Contractor is responsible for portioning off the shower area to maintain a secure work area.