Specifications include, but are not limited to: Coleytown Middle School, (CMS), located at 255 North Avenue in Westport, has experienced high humidity issues, due to current HVAC issues and building exterior envelope problems. In September 2018, school administration determined that the school must be closed to students indefinitely to evaluate the school. Since that time the Westport Board of Education has commissioned a preliminary study of the issues, The Town of Westport has commissioned a peer review, and an independent Town appointed committee has prepared a separate independent review of current conditions. The general results of these studies point to three main problems to be addressed: a) The HVAC system, b) moisture incursion and air leakage through portions of the building envelope, and c) site work improvements to direct water away from the building. The Town is soliciting qualifications statements from Commissioning Agents. The Commissioning Agent will be expected to provide services during pre-construction, construction, acceptance and post acceptance.