Specifications include, but are not limited to: 2.1 CARRIER VEHICLE SPECIFICATION: A. The SRE carrier vehicle must be in accordance with FAA Advisory Circular 150/5220- 20A “Airport Snow and Ice Control Equipment”, SAE ARP 5539 “Rotary Plow with Carrier Vehicle”, and SAE ARP 5564 “Airport Runway Brooms”. B. The carrier vehicle must be supplied with the equipment, capabilities, features, and options specified in the Equipment Specifications Checklist at the end of this technical specification. As part of the proposal, the supplier must fill out the checklist and check the appropriate box indicating whether the specified equipment can be provided. For any item in which the supplier cannot provide equipment to meet the specified requirements, a detailed explanation must be included in the provided box. C. Materials and components: See referenced SAE ARP equipment specifications for the attachments. 2.2 HIGH-SPEED ROTARY PLOW SPECIFICATION: A. High-speed rotary plows and carrier vehicles must be in accordance with FAA Advisory Circular 150/5220-20A “Airport Snow and Ice Control Equipment” and SAE ARP 5539 “Rotary Plow with Carrier Vehicle”. B. The high-speed rotary plow must be supplied with the equipment, capabilities, features, and options specified in the Equipment Specifications Checklist at the end of this technical specification. As part of the proposal, the supplier must fill out the checklist and check the appropriate box indicating whether the specified equipment can be provided. For any item in which the supplier cannot provide equipment to meet the specified requirements, a detailed explanation must be included in the provided box. 2.3 RUNWAY BROOM WITH AIRBLAST SPECIFICATION: A. Runway broom with airblast must be in accordance with FAA Advisory Circular 150/5220-20A “Airport Snow and Ice Control Equipment” and SAE ARP 5564 “Airport Runway Brooms”. B. The runway broom with airblast must be supplied with the equipment, capabilities, features, and options specified in the Equipment Specifications Checklist at the end of this technical specification. As part of the proposal, the supplier must fill out the checklist and check the appropriate box indicating whether the specified equipment can be provided. For any item in which the supplier cannot provide equipment to meet the specified requirements, a detailed explanation must be included in the provided box.