Specifications include, but are not limited to: The Project consists of the replacement of the humidifier and appurtenances on AHU-10 located on the subbasement of floor of Building – K at the University of Connecticut Health Center, in Farmington, Connecticut, as required in these Specifications. B. The work shall consist of that identified on the Contract Documents to provide for replacement to the humidifier, controls and supporting PRV. C. The work includes, but shall not be limited to the following: Demolition • Removal of the existing humidifier • Removal of controls package • Removal of steam piping and pressure reducing valve • Removl of related power and control wiring as required to install replacement humidifier