Specifications include, but are not limited to: 1) Consult with The HomewardBound of the Grand Valley, Inc. Project Manager 2) Provide any necessary architectural drawings, material specs, and proposed warranty of the roof materials and installation. A minimum of 2-year workmanship and 15-year product warranty is required. 3) Order and install necessary material and supplies as follows: a) Prepare the existing roof for the new roofing system, including any required tear-off. b) Install 1/2” fanfold over the existing roof. c) Install 60 (sixty) mil, white, mechanically fastened TPO over the roof. d) Install new metal flashings to create a watertight roofing system. e) Replace and install all sewer pipe jacks with TPO weldable pipe boots. f) Replace existing scupper with TPO weldable metal scupper. g) Reuse existing parapet cap. h) Jobsite will be cleaned and all trash removed daily. 4) Work Directly with The HomewardBound of the Grand Valley and Project Manager on installation dates. The facility will remain in operation so the building must remain habitable at all times.