Specifications include, but are not limited to: provide engineering services for the development of a raw water distribution system for purposes of delivering raw water from the City’s Water Plant to City property located in west Orchard Mesa and the north side of the Colorado River water front. The services entails rehabilitation or slipline of approximately 5800 feet of abandoned 16 inch water line, extension of approximately 2050 feet of 12 to 16 inch water line, 2000 feet of rehabilitation or slipline of 2000 feet of abandoned 20-24 inch cast iron/steel then 1400 feet of 12 inch line to the proposed Riverfront at Las Colonias Park development. The proposed services include water system modeling to initially provide raw water to the cemetery, Duck Pond Park, Riverside Parkway interchange at Highway 50, Botanical Gardens, Amphitheater, and the proposed Riverfont at Las Colonias development (Phase I) and eventually to Eagle Rim Park (Phase II), Jarvis Property (Phase III) and the Riverside Park (Phase IV).