Specifications include, but are not limited to: Install a new 6”water well at the Airburst Range, near the existing water well and the existing well is to be decommissioned and capped. The new water well must meet or exceed the state of Colorado minimum standards for underground water well for industrial uses. Power for the new well shall be extended from the existing well to the new well. The ideal location for installing the new water well would be near the existing water well and cistern. Connection of the piping in the new water well to that of the existing cistern to deliver the water from the well to the cistern, at a rate not less than 10 gallons per minute (GPM) consistently. The existing piping from that point back to the exiting line shall be removed or capped and abandoned in place.