Specifications include, but are not limited to: The selected contractor is expected to visit each site and come up with a wiring, installation, testing and verification plan. Contractor will notify Ed Webb at 970‐749‐6729 before visiting any School District sites. All existing locksets will be given to owner as they are replaced. All wiring should be concealed and any exposed conduit or moulding must be approved in advance by the owner. Work shall be done in a professional manner and when finished all parts of the building will be restored to the original condition. Some preparatory work can be done while school is in session, however most of the installation will occur after June 4 and before August 15. Security must be maintained at all times and doors must be locked at the end of each day