Specifications include, but are not limited to: 1. The City of Fort Morgan, Henderson to Excel 115kV Transmission Line Project involves the following: a. Rebuild the 115kV transmission line between Henderson Substation, East Substation, and Excel Substation. The existing transmission line consists of one 115kV circuit on self-supporting steel poles from Henderson Substation to East Substation, and wood poles from East Substation to Excel Substation. b. Replace the existing 115kV guyed wooden deadend structure 762 located at the intersection of County Road 20 and Road Q. 2. The new 115kV transmission line will be built using self-supporting tubular steel poles. The Henderson to Excel line will consist of one 115kV transmission circuit with one 12.47kV distribution underbuild circuit. 3. Contractor is responsible for coordinating traffic control for crossing Highway 34 and coordination with the City of Fort Morgan and Union Pacific Railroad for the railroad crossing. 4. The City of Fort Morgan operates a loop fed 115kV transmission system. The transmission system can be isolated between each substation. Therefore, the existing 115kV transmission line will be de-energized during construction. 5. In order to maintain service to the East Substation the Contractor is responsible to design and build a shoefly to bypass the location of the new 3-way switch outside of East Substation. 6. Construction will require two (2) outages performed at night. These outages will involve connecting the shoefly to East Substation, and connecting East Substation to the new 3-way switch 7. Construction will be completed in the following phases: a. Henderson Substation to East Substation b. East Substation to Excel Substation c. County Road 20 and Road Q 8. Contractor will be responsible for installing 12.47kV underground distribution from the Henderson Substation Feeder Bay to the Henderson Riser and from the East Substation Feeder Bay to the East Riser.