Specifications include, but are not limited to: The project consists of construction of a new storm water detention facility and jurisdictional dam for flood prevention and sedimentation control. The project site is located in the northwest corner of Garden of the Gods Park in the Camp Creek Drainage, adjacent to North 30th Street, and just south of and adjacent to Glen Eyrie (The Navigators.) The dam is an approximately 27-foot tall earthen embankment with 4:1 side slopes and will provide approximately 170 acre-feet of storage volume below the crest of its emergency spillway. The 365-linear feet wide spillway and downstream face of the dam will be armored with roller compacted concrete. A portion of the existing grouted boulder-lined channel at the upstream end of the facility will be realigned and a grouted boulder drop structure will be constructed to convey the Camp Creek flow into the reservoir.