Specifications include, but are not limited to: Qualified firms to provide engineering design and construction services for the addition of a High Speed Turbo (HST) Blower at the Town of Windsor Wastewater Treatment Facility. The Scope of Work shall include but is not limited to the following: • Prepare design drawings and specifications for the addition of a 300 horsepower HST blower to replace existing centrifugal blower at the Town of Windsor Wastewater Treatment Facility. • Issue the final plans and specifications and assist the Town for solicitation of bids from contractors for construction of the project. • Hold a pre-bid meeting that requires the attendance of the prime bidding contractors. • Issue addenda resolving construction and contractual questions issued by contractors, sub-contractors and equipment representatives. • Attend the bid opening at the Windsor Town Shop. • Review bids and make recommendation for award of the project.