Colorado Mountain College (CMC) is seeking proposals for construction of fiber ‘ring’ for the Steamboat Springs campus at 1275 Crawford Avenue, Steamboat Springs, CO.
SPECIFICATIONS
Fiber Plant Construction at Steamboat Springs Campus – Scope
Desired Paths and Priority
• *New Path* - ‘Steamboat Academic Building’ to ‘wireless carrier area’
o Inside conduit paths may exist and may be used
o 19” rack space and/or plywood backboard is available for fiber splice case or distribution panel mounting
o A fiber vault should be installed at the ‘wireless carrier area’ as a splice point
Fiber vault should be of sufficient size to contain service coils and splice closure
Carriers will be responsible for pathing from sheds to vault
o Additional vaults and handhole should be installed as necessary
• *New Path* - ‘wireless carrier area’ to ‘Hill Hall’
o Should follow ‘upper’ road along hillside if possible
o Vaults and handhole should be installed as necessary
• *New Path* - ‘Hill Hall’ to ‘Anderson Facilities Building’
o May share a portion of the ‘wireless carrier area to Hill Hall’ path
Separate conduit should be used, ideally
• ‘Anderson Facilities Building’ to ‘Bristol Hall’
o Existing conduit path with OM1 fiber
• ‘Bristol Hall’ to ‘Steamboat Academic Building’
o Existing conduit path with OM3 fiber
Desired Conduit
• Two 2” conduits with pull tape per outside path
o Other conduit sizes may be listed as alternates
• HDPE is acceptable
• Inside paths should use innerduct or conduit
o Size is negotiable
Desired Fiber-Optics
• Single-mode fiber
• Minimum of 48 strands. 72 and/or 96 strand count may be listed as alternates.
• LC termination of 24 strands at designated Bristol Hall, Steamboat Academic Building, Hill Hall, and Anderson Faculties Building telecom rooms
• 24 strands spliced at ‘wireless carrier area’ vault
o Include necessary splice closure
Proposal Requirements
In addition to quoting the full project, please quote the individual ‘new paths’ as separate projects, including necessary mobilization. Weather, funding, and other logistics may require the project to be completed in phases.
See ‘Steamboat Campus Fiber.kmx’ for approximate locations or existing faculties and desired paths.
TIMELINE
December, 7th, 2018