Separate sealed bids for CHAMBERS ROAD WIDENING PROJECT (LINCOLN TO MAINSTREET) DOUGLAS COUNTY PROJECT CI 2016-014 will be received by the Owner, Douglas County Government, Department of Public Works Engineering, Philip S. Miller Building, 100 Third Street, Suite 220, Castle Rock, CO 80104, until Tuesday, June 5, 2018, at 2:00 p.m. This project provides for the widening of Chambers Road from Lincoln to Mainstreet by increasing the number of thru traffic lanes from two to four, installing a 10-foot wide multi-use path along the east side, and the proposed roadway section will accommodate left-turn lanes where warranted. This project also includes installing a traffic signal at the southern intersection of Chambers Road and Cosmopolitan Circle.
The Contract Documents will be available after 10:00 a.m. on Monday, May 14, 2018, through Rocky Mountain E-Purchasing System Website (www.rockymountainbidsystem.com) or they may be obtained at the above address. Electronic versions of the Plans obtained by any other means than as described above may not be complete or accurate, and it is the Bidder’s responsibility to obtain a complete set of the Project Plans and Specifications. Douglas County will not be held responsible for misinformation received from private plan rooms.
A pre-bid conference will be held at 10:00 a.m. on Wednesday, May 23, 2018, at the Department of Public Works Engineering, Philip S. Miller Building, 100 Third Street, Suite 220, Castle Rock, CO 80104. All questions are due to Neil Sarno, Project Engineer by 12:00 p.m. on Tuesday, May 29, 2018. The Bid Opening will be conducted at 2:00 p.m. on Tuesday, June 5, 2018, at the same address.
The Project includes the following major items and approximate quantities:
- Hot Mix Asphalt, 12,466 Ton
- Aggregate Base Course, 10,757 CY
- Median Cover Material (Exposed Aggregate) 35,836 SF
- Unclassified Excavation (Complete In Place) 22,846 CY
- Overexcavation (24 Inches) 11,270 CY
- Curb and Gutter Type2 (Sections I-M, II-M, II-B) 13,389 LF
- Concrete Sidewalk (6 Inch) 8,916 SY
- Removal of Temporary and Install of New Traffic Signal Equipment
- Drainage-Reinforced Concrete Pipe (CIP), Inlets and Manholes
- Signing and Striping
- Erosion Control
Prior to submitting a Bid Proposal, Bidders shall have received prequalification status (active status) with the Colorado Department of Transportation to bid on individual projects of the size and kind of work as set forth herein.
Any questions on the bidding process shall be directed to Neil Sarno, Project Engineer at 303.660.7490.
Plan holder information, can be found on the Rocky Mountain E-Purchasing System Website.