The work to be performed under this contract includes removal and replacement of existing concrete including concrete pavement, crosspan, sidewalk, curb and gutter, curb ramps, asphalt patching, full depth reclamation, various depths and types of milling of existing asphalt pavement, and various thicknesses of asphalt paving within the streets listed in the Appendices or as directed by the Project Manager. The Contractor shall supply all labor, equipment, and materials necessary to complete the work in accordance with these specifications. The contract shall be awarded based on bids received and the contract documents. Night work shall be required and entail asphalt patching, asphalt milling, and asphalt overlay on Prairie Hawk Drive between July 9, 2018 and July 20, 2018. Woodlands Boulevard asphalt milling and asphalt overlay shall be performed between May 29, 2018 and June 15, 2018. Full depth reclamation shall not be performed prior to May 29, 2018. Contractor shall acquire all agreements, permits and insurance as necessary to allow work within CDOT’s R.O.W. at Woodlands Boulevard and Founders Parkway. Contractor will be required to coordinate construction activities with adjacent businesses, trash removal companies, school district, HOA, Metro Districts, and other Town maintenance projects if applicable. Contractor shall acquire all Town of Castle Rock and State of Colorado stormwater permits as applicable, approved plans will be provided after notice of award is issued. The contractor shall commence work no later than ten (10) calendar days from, and including, the date of the Notice to Proceed, and be construction complete (including punchlist items, cleanup, and demobilize) within sixty-five (65) working days from the date on the Notice to Proceed. Work shall take place between May, 2018 and July, 2018.