Specifications include, but are not limited to: 1. Levee repairs at nine (9) sites: a. Mobilization and demobilization. b. Developing staging areas as needed. c. Temporary fencing around all work sites and staging areas, and turbidity curtains for, at a minimum, sites requiring in-water construction. d. Exclusionary fencing around trees and other vegetation, including padding around the trunks of trees. e. Traffic control and flagging for public safety. f. Installing and maintaining traffic detours in accordance with detour plans as required. g. Tree removal from the site, including removing stump and roots, and providing certified arborist for tree trimming and branch removal. h. Clearing and grubbing. i. Excavation and backfilling, and disposal of excavated material. j. Geotextile fabric, rockfill, launch rock and bedding material. k. Earthfill. l. Agricultural soil on finished slopes and in voids in rockfill to form soil-filled rockfill. m. Surface treatment including seeding, agricultural soil, native top soil, aggregate chinking and erosion control fabric placement. n. Pole cuttings