Specifications include, but are not limited to: The work consists of the construction of approximately 1-mile of new water main pipeline of various sizes on Cypress Street from Azusa Avenue to Vincent Avenue, including all intersections, as indicated on the construction plans. The work on Azusa Avenue consists of line stops and the installation of valves from Cypress Street to Arrow Highway and approximately 300 linear feet of new pipeline as indicated on the construction plans. The water main installation shall consist of approximately 300 linear feet of 8-inch ductile iron pipe water main, 50 linear feet of 10-inch ductile iron pipe water main, 120 linear feet of 12-inch ductile iron pipe water main, 1,600 linear feet of 18-inch ductile iron pipe water main, 300 linear feet of 20-inch ductile iron pipe water main, and 4,000 linear feet of 24-inch ductile iron pipe water main, in the County of Los Angeles and the City of Covina, including valves, fire hydrants, line stops, services, connections, abandonments, appurtenances, pavement replacement, concrete replacement, street restoration, sidewalks, bus pads, driveways, slurry seal, traffic control, and all supplies, equipment, shoring, services, bidding schedule items, and transportation necessary to construct and complete the project entitled: CYPRESS WATER TRANSMISSION MAIN REPLACEMENT PROJECT NO. W-277