Specifications include, but are not limited to: 1. Contractor will provide all necessary labor, equipment and incidental supplies to complete the following project requirements: a. Excavate the site to accommodate the footings for the new flag pole. b. Construct forms and place reinforcing steel for the new flag pole base. c. Pore and finish 5 – ½ sack concrete to complete the pole base and flat work. d. Install three LED electric flag pole lights and related conduit system and wiring. e. Install a new fiberglass 30 foot tall flag pole. 2. All new construction will be colored to match existing concrete in the park. Contractor will provide the owner with a concrete sample 12 inches square for color and texture comparison purposes. Contractor will not pour concrete until owner approves the color and texture sample. 3. Any existing finished surfaces damaged or modified during construction will be repaired or replaced. 4. The Contractor will be responsible for the proper handling of all waste and clean up from the project including all disposal costs.