Loading...
Skip to main content
< Back to results

Sunnyside and Geneva Fencing


Location
California
Publication Date
01/11/2019 09:46 AM EST
Closing Date
01/24/2019 05:30 PM EST
Issuing Organization
City and County of San Francisco
Solicitation Number
Description

Specifications include, but are not limited to: a.Remove approximately 675 linear feet of 6 ft. tall chain link fencing fabric and top rail along the Geneva Avenue Crocker Amazon Park frontage, between the Moscow St. entrance to main staircase between baseball fields and soccer fields. Replace chainlink fabric with black vinyl-coated fabric per specifications below. b.All existing H-posts to remain except the ten (10) posts shown on Figure 1 which shall be replaced. Plumb existing H-posts as necessary. Existing H-posts to remain shall be cut at 3’-0” above finish grade. New 6ft high post to be sleeved over existing H-posts. Fill new post sleeves with grout to top of existing H-post cut. Add post top. c.Remove and clear existing ivy and overgrown vegetation as necessary.

Source
http://mission.sfgov.org/OCABidPublication/BidDetail.aspx?K=13760 (opens in a new window)

Get instant access

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Group

Matching bid notifications from participating agencies

Basic

Access participating agency bids