Specifications include, but are not limited to: 1. Surveying and Base Mapping. Consultant shall perform aerial surveys and/or field surveys as necessary to determine existing public Right-of-Way and centerlines, locate survey control monuments, provide topography base map with 1 foot contours, existing permanent features (such as traffic sings, utilities, etc) and sufficient spot elevations for the roadway design, including design cross sections, and earthwork estimates. Consultant shall submit copies of all field notes and permits to the Town. 2. Utility Research and Coordination. Consultant shall coordinate with all other affected regulatory agencies and all other affected utility agencies. Consultant shall perform all required utility research and coordination as required. Consultant shall contact all utilities by written correspondence to determine existing utility line locations. Consultant shall provide the Town copies of all correspondence to and from regulatory and utility agencies. Consultant is to provide research (including sub-surface pot holing and overhead clearance) as required to complete any removal, relocation, or adjustment to any existing utility facilities or adjust design where conflicts are anticipated. All existing utility facilities shall be shown on the plans and any probable conflicts shall be noted. The Consultant shall document this work and any regulatory or utility issues that need to be addressed. 3. Preliminary Design and Right-of-Way requirements. Consultant shall develop 30% preliminary plans and estimates, alternative detailed alignments, typical sections, which shall include all the necessary work to allow the construction of the proposed improvements. Under this task, the Consultant shall research any and all public records available which demonstrate ownership of right-of-way necessary to construct the proposed improvements. In addition, Consultant shall provide information on any property that will need to be acquired in order to construct the proposed improvements. Consultant shall present alternative preliminary design concepts to Town staff. Once the Town Engineer approves a preliminary concept Consultant will proceed to final design.