Specifications include, but are not limited to: A. CONTRACTOR shall deliver, install, and maintain an operational sludge dewatering centrifuge unit in dewatering the sludge at the City’s Wastewater Treatment Plant. 1. Unit shall be installed and operational on September 1, 2020 and remain operational until May 31, 2022, or until the date extended per the provisions of this agreement. a. Agreement may be extended up to 1 year at the same monthly rent beyond May 31, 2022, at the discretion of the City. b. The City may choose the option to purchase at the end of the agreement period or earlier as provided under this agreement. B. Unit shall be capable of dewatering anaerobically digested sludge from the 10.8- 12.0 MGD wastewater treatment facility. The centrifuge unit must achieve this in an average run time or no more than 10 hours per day. 1. Unit shall be capable of dewatering sludge to a dryness of 16% or greater. 2. City will have access and use of the provided equipment 24 hours per day for each day of the agreement. C. CONTRACTOR shall furnish, install and make operational all elements of sludge dewatering including but not limited to the following. 1. Sludge dewatering centrifuge with supports/foundations as needed a. The City prefers centrifuge technology, but other dewatering technology proposals would be considered. 2. Progressive cavity OR peristaltic polymer pump. 3. Water/Polymer blend unit. 4. Conveyors and augurs as needed to load a 12 yard dump truck. 5. All electrical wiring, hoses, and any other accessories required for a functional dewatering centrifuge 6. Setup and removal. D. City will provide 1. A 480 volt 100 amp electrical service. 2. Non potable process water 3. Polymer in IBC totes. 4. Dump Truck E. Installation environment will be an outdoor harsh environment with no protection from rain, wind, or other nuisances. Installation must be compatible with such an environment.