Specifications include, but are not limited to: Hydro-jetting Hydro-jet approximately1.8 miles of clay sewer pipe (approx. one mile of 4” pipe, and 0.8 miles 6” pipe). Hydro-jetting will start at the southern end of the sewer line system and proceed north to manholes 300’-500’ apart. Outdoor sink drain laterals (31) will be hydro-jetted into the mainline during process. All sand, roots, dirt, and debris will be routed (by hydro-jet process) to the three (3) wet wells located in front of the three lift stations. This is to also include cleaning and hydro-jetting of ALL outside sinks sand traps throughout the campground. Pumping Pumping of the wet wells will occur immediately after sand, roots, dirt, and debris has been hydro-jetted into wet wells. Pump operator and pump truck will standby wet well until approval by Hydro-jet operator and lift station monitor. Upon approval of State’s Representative, pump operator will commence pumping all sand, roots, dirt, and debris until wet well is clean. Pumping will continue until all four lift station wet wells are clean. Disposal of contents of wet wells will be the responsibility of the pump operator and not the state.