Specifications include, but are not limited to: i. Completely demolish each structure. ii. Remove foundation(s). iii. Removal all debris, trash and residue related and created during the demolition process and transport to an approved land fill. iv. Cap sewer within five (5) feet of the property line. v. Obligation and responsibility for determining the location of any or all abandoned wells, shafts, openings, septic tanks, cesspools, basements, pits or other like hazards lies with the property owner or contractor. All such hazards shall be abated as per Section 722.0, Uniform Plumbing Code, or by methods approved by the Building Official. vi. Burying, covering, or otherwise discarding of debris on the demolition site is a violation of Riverside County Ordinance 348. vii. In instances regarding excavation and removal of service station storage tanks, or other excavations such as swimming pools where substantial back fill is involved, a compaction report by an approved agency shall be filed with the Building Department. viii. Contractor is responsible for notifying all utility companies to remove and/or disconnect all utilities to the structure including all buried pipes, wires and conduits.