Specifications include, but are not limited to: Vendor shall be responsible for the following: 1.Disassemble, and inspect each valve. 2.All new spiral wound gaskets of suitable rating and size shall be supplied by the contractor. 3.All new wired seals and tags shall be supplied by the contractor. 4.If required, new hardware (studs, nuts, fittings, etc.) shall be supplied by the contractor. 5.Contractor shall supply all transportation, for the valves, from and to the Redding Power Plant. 6.Contractor shall provide a detailed report of repair recommendations and a quote for repair for each valve, if required. 7.Contractor shall reassemble, test, and certify a total of twelve (12) safety valves. 8.If needed, Contractor shall obtain City approval to provide needed repairs on valves. 9.Contractor shall provide a detailed report documenting all inspections, repairs, testing, and certifications which shall be provided within 30 calendar days of completed work