Specifications include, but are not limited to: The work consists of removing and reconstructing asphalt berm, cold planning existing asphalt pavement, placing a layer of Asphalt Rubber Aggregate Membrane (ARAM), and resurfacing the road with an Asphalt Rubber Hot Mix (ARHM) overlay. The work also includes: removal and reconstruction of ADA access ramps, curb and gutter, commercial driveway approaches, concrete sidewalk, adjustment of survey monument covers, sewer manhole covers, street light and the adjustment of traffic signal pull boxes to grade, replacement of water valve box assemblies, coordination of the adjustment of utility structures with utility purveyors, the replacement of traffic striping, traffic detector loops, raised pavement markers, and all additional work necessary to properly construct the proposed improvements.