Specifications include, but are not limited to: The project consists of constructing a 10-foot wide 4,841-foot linear River Park Trail between a new 0.32 acre staging area at the southern corner of Bridge Road and Bridgevale Road and the recently constructed Apricot Park. A 10-foot wide pedestrian and bicycle trail will pass under the existing San Juan Hollister Bridge and connect to an existing unpaved levee maintenance road for the Industrial Waste Water Treatment Plant (IWTP) where it will connect to the western end of Apricot Lane and the Apricot Lane Park. The trail will be constructed with base rock overlaid with decomposed granite mixed with beeswax. The beeswax will prevent erosion and reduce maintenance costs. An existing six-foot cyclone perimeter fence on the levees will be relocated to prevent pedestrian access to the IWTP and replaced with an eight-foot wrought iron fence. The west side of the trail will be improved with four-foot high split rail fencing.Existing debris on the southern perimeter of the IWTP includes rip-rap and cement debris that would be relocated to an unused area of the IWTP. Native trees will be planted along the trail to provide shade and enhance habitat. Benches will be installed along the trail. The project would impact approximately 2 acres within the floodplain but does not propose to radically alter the grades or fill to remove the area from the floodplain. There are no habitable structures proposed within the floodplain.