Specifications include, but are not limited to: The furnishing all materials, equipment, tools, labor and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be performed hereunder consist of traffic control; implementation and maintenance of Best Management Practices SWPPP; construction staking and monument perpetuation; removal and replacement of PCC curb ramps, gutters, and sidewalk; new driveways and walkways, drainage improvement, asphalt concrete; and adjustment of surface utilities to grade. The work also includes traffic striping and pavement markings, Landscaping and irrigation, monument sign and all associated work as identified on the construction drawings.