Specifications include, but are not limited to: Removal 1) Contractor shall remove, haul away, and legally dispose of all existing metal fencing where new fencing is being installed, fence posts that are damaged and/or cannot be reused by sleeving, concrete footings, posthole dirt and soil (posthole dirt shall not remain on site), and existing fence gates and motors where new fence gates and motors are being installed. 2) Contractor may utilize the existing fencing as temporary fencing prior to removal. 3) Contractor shall remove all existing conduit without damage so as to reinstall on new fence. 4) Contractor shall remove all signage from existing fence without damage so as to reinstall on new fence. Signage shall be provided to the Caltrans Contract Manager or designee immediately after removal.