Specifications include, but are not limited to: The CONTRACTOR shall furnish all tools, equipment, materials, and supplies and shall perform all labor required to complete the protective coating of all specified surfaces. This work shall include all surface preparation, pretreatment, coating application, protection of surfaces not to be coated, cleanup, and appurtenant work, in accordance with the requirements of the Contract Documents. The CONTRACTOR shall replace the coating of the 66-inch north and south vault pipes, 84-inch north and south vault pipes, two 108-inch west-vault pipes, associated actuators and stems, and associated support brackets and surfaces.Contractor Qualifications/ CONTRACTOR shall possess:a) Valid SSPC-QP1 certification for coating of complex steel structures.b) Valid class C-33 Painting and Decorating Contractors license