Specifications include, but are not limited to: The work consists of rehabilitation of approximately 5,364 feet of existing 18-, 24-, 27- and 33-inch diameter vitrified clay pipe (VCP) and reinforced concrete pipe (RCP) on the Old River School Road Relief Trunk Sewer and Old River School Road Trunk Sewer with cured-in-place pipe (CIPP) liners, and all appurtenant work. Two (2) segments are located along the existing sewer alignment beginning approximately 270 feet east of Karmont Avenue, then easterly and northerly through private property and along Old River School Road, and ending in Old River School Road approximately 100 feet north of Firestone Boulevard. One (1) segment is located along the existing sewer alignment beginning in private property near the intersection of Old River School Road and Imperial Highway and ending in Old River School Road at the intersection of Leeds Street.