Specifications include, but are not limited to: • Installation of a partially buried 4.5-MG pre-stressed concrete water storage tank (WST) and tank leak detection system• Construction of three valve vaults• Modification of filter water sampling point• Sourcing and installation of all necessary piping and valves for connection of new WST to the NESWTF and distribution system• Site preparation, site grading, and finishing• Construction of access roads and gates• Construction of security fencing/wall• Construction of sidewalk and partial street lighting along East Behymer Avenue• Electrical and control wiring for WST operations in conjunction with existing NESWTF operations• Coordination of instruments, controls, and programming with City of Fresno’s integration contractor• Testing and commissioning of new WST