Specifications include, but are not limited to: It is the intent of these specifications, terms, and conditions to describe the Micro-Level Sensoring Pilot Project. This project will provide professional services to delineate rainfall dependent inflow and infiltration (RDII) flow contributions within an identified sanitary sewer project area. This micro-level sensoring project will utilize a downstream control flow meter and upstream level meters to discretize flow contributions from segments within a project area. The project is to include the installation and maintenance of fifteen (15) level sensors and one (1) area-velocity flow meter. The equipment will be installed during a portion of the wet weather season from February 1, 2020 through April 15, 2020. Additionally, East Bay Municipal Utility District (District) will have an option to pilot a second project area in the following wet weather season.