Specifications include, but are not limited to: Currently there are three eastbound lanes going from 900’ E/O Disneyland Dr. to Hotel way and there is no designated turn lane going into the Convention Center. Katella Avenue Widening project proposes an additional eastbound lane allowing drivers to turn left on Convention Center. The purpose of this project is to improve the flow of traffic on this segment of Katella Avenue. Two electronic Changeable Message Signs (VMS/CMS) systems will be installed to provide parking information and traffic directions for the events in the area. The work consists of removing, widening and constructing the convention center frontage. This includes cold planning existing asphalt pavement, resurfacing the road, removal and reconstruction of ADA access ramps, curb and gutter, driveways, concrete sidewalk, tree and landscape work, adjustment of survey monument covers, sewer manhole covers, street light and the adjustment of traffic signal pull boxes to grade, replacement of water valve box assemblies, coordination of the adjustment of utility structures with utility purveyors, the replacement of traffic striping and all additional work necessary to properly construct the proposed improvements.