Specifications include, but are not limited to: 1.Field Level Controllers: As specified in Attachment B –Sole Source Product Data and Attachment C–Sample Project Specifications and Exhibits, Section 251400, IAS Network Controllers for HVAC,please submit the following information:a.Provide product data for DDC field level equipment controllers in compliance with the standard. Do not provide product data for sensors, actuators, control valves, dampers, or other non-communicating control components.b.Provide the BACnet Testing Laboratories (BTL)listing and Protocol Implementation Conformance Statement(PICS)BACnet conformance statements for every controller planned for use on District projects. These include BACnet Advanced Application Controllers (B-AAC’s) and BACnet Application Specific Controllers (B-ASC’s).\c.Clearly identify on each submitted controller product data title sheet which of the following pieces of equipment the controller would be utilized for. Multiple pieces of equipment can be indicated on a single controller data sheet,if applicable.Built-Up Variable Air Volume (VAV) Air Handling UnitPackaged Direct Expansion (DX) Air HandlerPackaged DX VAV Air HandlerFan Coil Unit / Single Zone Air Handling Unit DX Split System / Heat PumpComputer Room Air Conditioning (CRAC) UnitWall Mounted Air Conditioning UnitExhaust Fan Terminal Air Unit with Reheat CoilChilled Water PlantCondenser Water PlantHeating Hot Water Plant2.Supervisory Controllers:As specified in Attachment B –Sole Source Product Data and Attachment C–Sample Project Specifications and Exhibits, Section 251400, IAS Network Controllers for HVAC, please submit the following information:a.Provide the Niagara Compatibility Statement (NiCS) documentation for every Java Application Control Engine (JACE)supervisory controller planned for use on District projects. Only JACE’s with the following open NiCS statements will be accepted:Station Compatibility In = AllStation Compatibility Out = AllTool Compatibility In = AllTool Compatibility Out = Allb.Responses submitted without NiCS statements will be automatically received 0 points. c.Clearly identify on each submitted JACE controller product data title sheet the type of project for which each JACE controller would be used.For example, “small projects under 1,000 points,” “large project over 10,000 points,” or “medium floor –approximately 1,500 points.”