Specifications include, but are not limited to: CONSTRUCTION OF IN-VESSEL DIGESTER (LIQUID AND FOOD PROCESSING AREA): which includes clearing and stripping, stock piling materials, excavation, subgrade preparations, placement of geotextile, placement of aggregate materials, placement of asphalt pavement, placement of concrete pavement, installation of Cast-In-Place Trench Drains, installation of a Cast-In-Place Concrete Pushwall, removal of an existing concrete storm drainage sump, and installation of a new HDPE manhole sump. CONSTRUCTION OF THE IN-VESSEL DIGESTER (EQUALIATION TANK SYSTEM) which includes installation of a steel corrugated equalization tank, installation of the Dual Purpose Liquid Agitation and Routing System, pH Adjustment System, installation of a submersible grinder pump into an existing sump, HDPE pipes, pipe bracing, flowmeters, fittings, valves, other valve assemblies, instrumentation, and all miscellaneous related work.