Specifications include, but are not limited to: This project will consist of excavation and exposure of the septic and holding tanks to determine where the leaks are entering into the septic system. Once discovered, contractor will repair and seal the tanks to the County’s satisfaction. This procedure must be completed before the rainy season 2019-20 due to the constant groundwater intrusion that takes place from the adjacent hillside. After repair and sealing are complete, the contractor will proceed with a diversion channel that will take hillside water and divert it away from the tanks and the leach field. The diversion channel consists of a concrete V-ditch, 3’ wide and 24” deep. Scope of Work for this project shall include the following improvements: 1. Demolition, clearing, grubbing, pruning, removal of trees, shrubs and debris, construction sign, temporary fencing, and other work necessary to prepare the site for construction of improvements, earthwork, grading, concrete work, rock filled drainage ditches, traffic control, storm water protection, and miscellaneous appurtenant facilities relating to the construction.