Specifications include, but are not limited to: a. Mobilization and demobilization. b. Provide all project documentation. c. Strip off old roofing, underlayments, flashings down to roof sheathing. Knock down or pull out fasteners to create smooth substraight. d. Dispose of debris to approved landfill. e. Install new 30-year Class ‘A’-rated composition roof shingles, over 30 lb. saturated asphalt roofing felt. f. Install self-adhered waterproof membrane at all eaves, rakes and valleys. g. Provide new copper flashing, including roof edges, step flashing and at pipes. h. Provide painted metal gutters and downspouts. i. Provide continuous vent under ridge cap. j. Provide continuous eave vents. j. Close off air passage at existing gable vent. k. Replace rotted 1X~ fascia/eave trim, paint. l. Remove satellite dish and retain for the State. j. Clean up site at conclusion of construction.