Specifications include, but are not limited to: The scope of work to be performed consists of, but not limited to, installation of traffic signals and safety lighting, fiber optic interconnect and related equipment; video detection system, traffic signal modifications, access curb ramps, sidewalk and curb and gutter repairs, pavement markers, signage and striping. The Contractor shall complete the portion of work for Church St and Terra Vista Parkway by July 31, 2020 to ensure there is no disruption to Terra Vista Elementary School which resumes school on August 6, 2020. Prior to the commencement of construction, the Contractor shall include the proposed work in the construction schedule to be submitted at the Pre-Construction meeting.