Specifications include, but are not limited to: Contractor shall perform engineering and calculations to determine if the existing Dry Agent Fire Protection System in Natural Resources (NR), Room 1B is adequate in size, features and code compliance to be relocated to Student & Business Services (SBS) Room 117 in the University Police Department. If feasible the contractor shall perform engineering and calculations to enable creation of Shop Drawings to support the relocation. Contractor to perform engineering and calculations to enable creation of Shop Drawings to remove the Fire Sprinkler heads in Room 117 SBS Building. Contractor to perform engineering and calculations to design a new Dry Agent Fire Protection System in NR Room 1A.