Specifications include, but are not limited to: Repair various streets by performing asphalt dig outs to repair failed areas; tree root pruning; various PCC improvements including but not limited to concrete curb and gutter replacement, curb extensions, sidewalk replacement, spandrel and cross-gutter replacement; asphalt cold milling and asphalt hot mix overlay; reconstruction of existing non-compliant curb ramps; retrofit existing curb ramps with truncated domes; construct new curb ramps adjacent to overlay streets; construct decomposed granite and pervious concrete walk ways; install railing; install conduit, pull boxes, install traffic loops; install traffic striping and marking; relocate and protect existing signs and roadway name stamps; landscape; perform traffic control, notifications, and postings, complete and in place.