Specifications include, but are not limited to: 1. (TC-1) Provide project Site Specific Safety Plan and Work Plan for Construction 1 L.S. 2. (TC-2) Furnish, Install, and Remove Temporary security Fence and Security gates with topping. 1 L.S. 3. (TC-3) Furnish, Place, and Remove Temporary Driveway Improvements to Prevent Vehicle Tire Tracking Off of the Substation Construction Site 1 L.S. 4. (TC-4) Clearing, Stockpiling, Loading, Transportation and Disposal of Existing Site Organic Material and Soil 1 L.S. 5. (TC-5) Preparation of Exposed Subgrade 1 L.S. 6. (TC-6) Site Fill and Grading 1 L.S. 7. (TC-7) Furnish and Install Riprap Protection 1 L.S 8. (TC-8) Furnish and Place Crushed Rock Surfacing 1 L.S. 9. (TC-9) Furnish, Install RCP Culvert and Provide Inlet/Outlet Protection 2 L.S. 10. (TC10,11 Construct Transformer / Switchgear Slab, Basin with Steel Grating and Supports, Sump, and Concrete Splash Pad 1 E.A.